<td id="jqhyt"></td>
  • Contact Us

    ADD: 16 Tongyi Road, Weihai City, China

    TEL: 86-0631-5233588

    FAX: 86-0631-5224345

    Current Location:Home > News center > Company news

    Main Structure of Phase II of Water Supply Project in Ozone, DRC Completed

    Release Time:1/25/2024 6:57:25 PM

    On October 8, the concrete pouring of the second floor roof of the water treatment structure was completed, indicating the main structure was done in the second phase of Ozone water supply project in the Democratic Republic of the Congo. The project construction includes: administrative building, pharmaceutical warehouse, water treatment structure, backwashing pump room, clean water pool and homogenization pool, etc., with total concrete volume reaching 12,000 m3. The owner requires the main structure should be completed by October 31, 2023, half year ahead of schedule, so as to provide support to the presidential campaign. The project team arranged the process rationally, organized employees to work overtime, and completed the main structure 22 days ahead of the deadline required by the owner.

    Copyright:Weihai International Economic & Technical Cooperative Co., Ltd.(c) Address :16 Tongyi Road, Weihai City, China  Lu ICP, number 12002982, -3 TEL:86-0631-5233588  FAX:86-0631-5224345  Lu public network security 37100202000269Number  Technical Support:Aosion
    黄色特级毛片高清免费,欧美 另类亚洲日本一区二区,欧美久久人人,99热只有精品网址 99精品国产免费无码 狠狠亚洲婷婷综合色香五月加勒比

    <td id="jqhyt"></td>
  • 女人18毛片A级久久久久| 久久久久一区| 日韩电影免费在线观看中文字幕| 国产成人在线观看免费网站| 国产精品丝袜美腿一区二区三区| 国产a∨天天免费观看美女| 亚洲色欲色欲综合网站sw0060| 一级毛片aaaaaa免费看| 亚洲日韩国产精品无码专区| 一区二区三区四区精品视频在线播放| 欧美日韩一区二区综合| 亚洲天堂中文字幕一区二区| 欧美不卡| 国产高清在线视频| 一本色道无码道在线播放| 国产精品视频永久免费视频| 在线观看精品国产午夜福利片| 国产精品久久久国产精品免费| 欧美成人国产精品视| 四虎影视国产精品一区二区|